Skip to main content
All CollectionsTheme Test
Why can't I run theme test with other tests at the same time?
Why can't I run theme test with other tests at the same time?
Kelly at ABConvert avatar
Written by Kelly at ABConvert
Updated over 2 weeks ago

Reason: Compatibility issues

Theme tests split user traffic between your current live theme and the test theme to compare their performance. However, other tests are incompatible with the test theme, making it impossible to run them simultaneously with a theme test.

What if other tests are active?

You won’t be able to proceed with creating a theme test. When choosing test types, you can see a “ongoing test” badge next to the theme test option.

Recommendations:

  • Stop other tests: Before creating a theme test, stop all other active tests in your store

  • Run tests sequentially: Complete the theme test first before initiating any additional tests

Conclusion

To ensure accurate results and a smooth setup, always run theme tests separately.

If you have any questions or feedback, feel free to reach to via [email protected] or through our support widget.

Did this answer your question?